- S -
SADT
Structured Analysis and Design Technique
SD
Sales and Distribution
SAPmail
Electronic mail system in SAPoffice with which you can transmit messages.
SAPoffice
The electronic mail system and folder structure in the R/3 System allows you to send documents internally (to other R/3 users in the same system) or externally (to users in other systems).
SAP R/2
SAP R/2 was the first compact software package for the whole spectrum of business applications from the SAP corporation. SAP R/2 runs on mainframes, especially IBM, BS2000 (Siemens' machines) or Amdahl.
Modules of SAP R/2
RF Financial Accounting
RA Assets Accounting
RK Cost Accounting
RK-P Projects
RP Human Resources
RM-INST Plant Maintenance
RM-QSS Quality Assurance
RM-MAT Materials Management
RM-PPS Production Planning and Control
RV Sales and Distribution
SAP R/3
R/3 is the SAP client-server solution It has proved hugely popular in many countries. The solution is available to many more companies than R/2 as a mainframe is not required.
It consists of the following modules:
BC Basis (includes ABAP/4 Programming Language)
AM Asset Management
CO Controlling
FI Financial Accounting
HR Human Resources
IS Industry Specific Solutions
PM Plant Maintenance
PP Production Planning
PS Project System
QM Quality Management
SD Sales and Distribution
MM Materials Management
WF Business Work Flow
SAP Retail
Includes more than 200 new business processes that have been designed specifically for retail purposes. This is the integral part of R/3 release 4.0.
SAProuter
Software module that acts as part of a firewall system.
SAPscript
SAP-own word processing system. The text editor supplied with the R/3 System for creating and editing documentation.
SCOPE
Supply Chain Optimization Planning & Execution
SERM
Structured Entity Relationship Model
Session Log
Record of a batch input sssion run. For each run, a session log is created.
SO
Sales Order
SOP
Sales & Operations Planning Sales & Operations Planning(SOP) is a flexible forecasting and planning tool with which sales, production, and other supply chain targets can be set on the basis of historical, existing, and/or estimated future data. Resource planning can also be carried out to determine the amounts of the work center capacities and other resources required to meet these targets.
No comments:
Post a Comment